Substation Australian Mining Project 30 Units 300kVA, 1000kVA, 2000kVA

Engineered a series of high-capacity containerized substations for a major Australian mining operation, delivering 30 units with power ratings of 300kVA, 1000kVA, and 2000kVA. The project involved the robust mechanical design and integration of heavy-duty switchgear and transformers to withstand harsh environmental conditions. Key responsibilities included structural integrity analysis, advanced thermal management, and optimizing equipment layouts for maintenance and operational safety within a containerized footprint.

Primary 3D design render of the containerized substation.

Primary 3D design render of the containerized substation.

View of the completed interior with all equipment installed.

View of the completed interior with all equipment installed.

3D render showcasing the internal equipment layout.

3D render showcasing the internal equipment layout.

Wiring and internal component installation in progress.

Wiring and internal component installation in progress.

Detailed 3D view of the internal components and assembly.

Detailed 3D view of the internal components and assembly.

A completed substation unit ready for shipping.

A completed substation unit ready for shipping.

The substation container under construction in the workshop.

The substation container under construction in the workshop.